by evi-admin | Sep 1, 2026
An attic space build-up after framing and decking are complete and ready to receive the roofing system.
by evi-admin | Sep 1, 2026
Structural work in progress on an attic space rebuild above a flat roof, showing the framing before the deck is covered.
by evi-admin | Sep 1, 2026
Sheathing going onto a newly framed attic build-up. The deck is closed in so the roofing system can be applied over it.
by evi-admin | Sep 1, 2026
New framing set out for an attic space build-up over a flat roof. Members are laid out and fixed before sheathing.
by evi-admin | Sep 1, 2026
An existing attic space stripped back and rebuilt above a flat roof. The old structure is removed before new framing goes in.