Cold-Ply with Ceramic Granules
Granulated Cold-Ply Field Membrane, Toronto
The open field of a cold-ply roof after the granulated cap has been laid.

Photographs From This Job
Select any photograph to open it full size. All 5 images came off this one job.





Photographed on our own job site. We do not publish client names or addresses.
About this job
The open field of a cold-ply roof after the granulated cap has been laid. This is the simplest looking part of any flat roof and the part that most rewards care, because every square metre of field is bounded by a seam and the seams are the roof. In these frames the laps run consistently in one direction, which keeps water moving across joints rather than into them, and they are held to a steady width rather than being generous in the easy stretches and tight where the run got awkward. The granule surface takes the ultraviolet load and gives grip underfoot. Cold-ply reaches this point more slowly than a torched system because the adhesive sets to its own schedule rather than the crew's, but the finished field behaves the same way afterwards, and it got there without an open flame on a roof that shares a wall with somebody else's house.
Project summary
- System installed
- Cold-applied two-ply with ceramic granule cap
- Scope
- Open field membrane and lap detail
- Property type
- Low-slope roof, Toronto
- Crew notes
- Laps checked along the full run rather than at the ends
Systems used on this job
What This Job Involved
In the words written against these photographs.
What is happening here
This is the simplest looking part of any flat roof and the part that most rewards care, because every square metre of field is bounded by a seam and the seams are the roof.
The detail that decides it
In these frames the laps run consistently in one direction, which keeps water moving across joints rather than into them, and they are held to a steady width rather than being generous in the easy stretches and tight where the run got awkward.
Why we do it this way
Cold-ply reaches this point more slowly than a torched system because the adhesive sets to its own schedule rather than the crew's, but the finished field behaves the same way afterwards, and it got there without an open flame on a roof that shares a wall with somebody else's house.
Systems and Services on This Job
Where this work sits in what we do, and where to read more about it.
More Projects Like This One
More flat roof projects of the same type across Toronto and the GTA.
Google Reviews
Reviews From Finished Roofs
These come straight from our Google Business Profile. We cannot edit them, reorder them or take one down, and the rating in the header is whatever Google is showing today.
Free, No Obligation
Want This Kind of Work on Your Roof?
We come out, get on the roof and put the scope, the system and the price in writing. No charge, and no obligation to proceed.




