Flat Roof Skylights
Multiple Skylight Installation on a Flat Roof, Toronto
Several skylight units set into a single flat roof.

Photographs From This Job
Select any photograph to open it full size. All 5 images came off this one job.





Photographed on our own job site. We do not publish client names or addresses.
About this job
Several skylight units set into a single flat roof. Multiple openings in one field change the job in two ways. Structurally, the framing has to be planned as a set rather than one opening at a time, because interrupting several joists in the same area concentrates the load transfer instead of spreading it. Practically, the curbs are set out together so the finished units line through, which is the difference between a roof that looks designed from the room below and one that looks like three separate decisions. Each curb is then flashed and tied into the membrane on its own, with the field membrane carried up and terminated, and the metal lapping over that termination. The water path between two closely spaced curbs also gets thought about here: a narrow channel between them is exactly where debris collects and where water sits after rain, so the fall between units matters as much as the fall to the drain.
Project summary
- System installed
- Curb-mounted skylights, framed and set
- Scope
- Several units set into a single roof
- Property type
- Low-slope roof, Toronto
- Crew notes
- Curbs set out together so the units line through
Systems used on this job
What This Job Involved
In the words written against these photographs.
What is happening here
Structurally, the framing has to be planned as a set rather than one opening at a time, because interrupting several joists in the same area concentrates the load transfer instead of spreading it.
The detail that decides it
Practically, the curbs are set out together so the finished units line through, which is the difference between a roof that looks designed from the room below and one that looks like three separate decisions.
Why we do it this way
The water path between two closely spaced curbs also gets thought about here: a narrow channel between them is exactly where debris collects and where water sits after rain, so the fall between units matters as much as the fall to the drain.
Systems and Services on This Job
Where this work sits in what we do, and where to read more about it.
More Projects Like This One
More flat roof projects of the same type across Toronto and the GTA.
Google Reviews
Reviews From Finished Roofs
These come straight from our Google Business Profile. We cannot edit them, reorder them or take one down, and the rating in the header is whatever Google is showing today.
Free, No Obligation
Want This Kind of Work on Your Roof?
We come out, get on the roof and put the scope, the system and the price in writing. No charge, and no obligation to proceed.




